Completed project

project details:

Project : Burjuman Centre Void Infill

Location : Dubai, UAE

Client : Burjuman

Sector : Retail

Start Date : April 2015

Completion Date : July 2016

 

overview:

This project is located within the existing Burjuman shopping center. The work involves the infilling of current feature Atrium void area at two levels to provide improved public access to the newly refurbished Burjuman section of the mall. Along with the void infill, the realignment of Tenant lease lines will take place to make more efficient use of the revised space.

The project will be carried out in 2 overlapping phases with phase 1 consisting of demolishing existing feature stairs followed by new Structural Steel framing with 2 hour fire protection, Metal Deck with Concrete and all associated Architectural and MEP alterations to achieve the infill of the existing void areas.

Phase 2 will consist of the realignment of existing Tenant demise lines and will include the demolition of existing shop fronts and retail division walls, new dividing walls to the retail spaces, all associated MEP alterations and landlord architectural finishes.

project data:

  • 50 tonnes Structural Street Erection
  • 600 m2 Concrete Slab Infills
  • 1500 m2 Suspended Ceiling
  • 1500 m2 Stone & Ceremic Floor Finishes
  • Column Finishes
  • New Retail Units, Shell & Core
  • MEP Alterations & Upgrades