Completed project

project details:

Project : Community Theatre & Arts Centre

Location : Mall of the Emirates, Dubai

Client : Majid Al Futtaim Investments

Sector : Entertainment

Start Date : March 2006

Completion Date : October 2006

overview:

The Theatre building comprising of a large Foyer with glass staircase to the upstairs lobby. The 550 seat Theatre has a curved acoustic ceiling, upper balcony, individual side boxes and a fully equipped 500 m² stage with stage rigging. The Theatre also houses Rehearsal rooms, workshop facilities, a Lounge Bar, Foyer, Bar, Exhibition Hall, Music, Pottery Rooms and a 150 seat Studio Theatre.

 

The adjacent Arts Centre has a large Exhibition area, as well as Music Studios, Pottery and Art Rooms Library and Offices.  

 

project data:

Total Area: 500 m² (5381.96 ft²)

Structural screeds

Steel Staircases

Acoustic Ceilings and Wall paneling

Gypsum Curved ceiling

Ceramic tile flooring  

Sprung timber floors

Column cladding in Perspex and steel panels

Aluminium and glass doors

Glass Feature staircase

Gypsum ceilings and bulkheads

Stainless steel handrailing

Male and Female Toilets 

Reception and Bar Counters

Theatre Lighting and sound systems

Electrical and Air conditioning installation

Stage rigging steelwork and Catwalks