Completed project

project details:

Project : Signage

Location : Dubai and Sharjah, UAE

Client : Majid Al Futtaim

Sector : Retail

Start Date : November 2013

Completion Date : May 2014

 

 

overview:

Following 2014 Launch by Majid Al Futtaim group of new brand image and logo’s Deira City Centre was selected as first Mall to be rebranded.

 

Al Tayer Stocks where appointed for the removal of existing mall signage inclusive of all fixings in various locations throughout the mall whilst the mall remained fully operational.

 

The scope of works include the making good of all areas disturbed by the works including the replacement of aluminum cladding, external render and plastering, painting and installation of new electrical conduit to suit the electrical point locations.

 

Following the installation of the new mall signage by a specialist contractor various forms of bird protection were then applied to the affected areas.

 

The Project was managed internally by MAF Properties in conjunction with MACE International with Cost Consultancy undertaken by AECOM.

project data:

Removal of all existing external signage and replace with New MAF ‘2014’ Rebrand signage throughout the Malls

Making good of all affected areas (stone, render, paint, cladding)

Installation of conduit to suit new signage illumination.

Installation of bird protection