Completed project

project details:

Project: Montgomerie Golf Course New Irrigation Pump Station Building and Extension of Car Paths

Location: Dubai

Client: EMAAR

Sector: Hospitality and Leisure

Start Date: June 2015

Completion Date: April 2016

overview:

Design and Build package for the Construction of a new Data Pump Station and MEP services Building including upgrade of the existing irrigation system and infrastructure at the Montgomerie golf course located with in the vicinity of Emirates Hills.

This involves the replacement of both the existing pump station and the underground main line of irrigation pipework.

In addition we are undertaking construction of new cart paths across all 18 holes for for total length of 4500m.

All work to be carried out in live environment during the normal opening hours of the golf course

project data:

1000m2 of excavation to pump Station

Construction of 115m2 area of RC frame

Construction of 7m deep wet well shaft

Installation of temporary dam to allow part dewatering of irrigation lake

Complete fit out to new pump station including specialist equipment

Installation of 16-24 inch main irrigation pipework - 1.2 km

Extension of existing cart paths - 4500m