Completed within a 4-month timeframe, the project included full architectural and MEP design, installation of a mezzanine floor, façade modifications, seven enclosed offices, two meeting rooms, a gym, café zone, reception area, toilets, and open workspace. Every element has been executed with exceptional craftsmanship and meticulous attention to detail.